Game 3 - 737-700 deliveries

Started by blair21088, March 06, 2009, 05:05:04 PM

blair21088

The 737-700 was certified on Nov 1st in game 3 and is supposed to be delivered at a rate of 15 per month. It's now February 18th and only 19 have been delivered. What am I missing?

lilius

It might share the production line with other aircrafts in the same family. The production line is producing different types of aircrafts of the same family and the highest total capacity for them is 15 per month.


jagalubnan

The 737-700 is part of the 737-600/700/800/900 fleet group.

blair21088

1) that's obvious to the point that i don't need to explain it. 2) the 737-700 was the only one certified 3) the first 70 or so planes are all 737-700s anyway.

jagalubnan

1) You asked a question, I was answering it in addition to lilius' post.
2) No need to be rude about it.
3) There's a difference between the date of certification, and date of the first deliveries.

blair21088

Certification and delivery are synonymous in this game.