Overlaping A checks and workforce

Started by mzazula, February 08, 2011, 01:20:17 PM

mzazula

Hello,

Does the way you schedule maintanance (A/B checks) influence the work force needed in the category "Technical services and maintenance"?

In other words: if I have 5 aircrafts and schedule all A/B checks for them on the same Saturday/Sunday night, will I need to hire 5 times as much technical staff as if I would schedule as check for different night for each aircraft?

Thanks in advance,
MJZ


Sami


knobbygb

QuoteNo, it's not that smart yet.

Oooh, that sounds ominous.  I'm careful not to have them all at the same time anyway but it would be more realistic if this were implemented at some point - I'm sure it's a big concern in the real world.  Also, it would be good if it were possible to schedule A checks while the aircraft is away from base resting overnight (which I do a lot).  Maybe that could be possible just at other airports of a certain size.  Anyway, this isn't the place for enhancement suggestions, sorry.