At one of my bases I have 100 aircraft based, but another 10 or so on order. One of them will be delivered during the next month. What will happen to this aircraft? My plan is to replace one of the aircraft I already have based with this new plane, but I am wondering if the aircraft will be delivered to the correct base if I do nothing? I was thinking of scheduling the routes about 1-2 weeks before delivery, at the same time removing one of my smaller planes at that base.
Will this work, or will there be any problems with this?
You can only schedule the max number, but you may have as many based as you like. So replacements are not an issue.
Thanks for the answer, then everything is crystal-clear!