I ordered 50 plus C Series 100/300 aircraft. They are arriving about 1-2 per month tops. Does anyone think this is too slow. I know the delivery schedules were changed to make the game more realistic. But I have heard that American Airlines in real life is receiving 737-800s at the rate of one per week for 2010-2012. 1-2 per month make the game extremely slow to replace older aircraft.
Yeah, it sucks hard, but sami will not change anything on this ...
Just a side note here, a 737 comes off the assembly line every 24 hours, there are 5 Assembly lines at the plant.
A 767,777,787, come off the line every other day at top production speed. I would say the delivery speed on here needs to change.
I was at the Evertt plant in Washington state the week before last.