AirwaySim

General forums => General forum => Topic started by: ekaneti on September 08, 2010, 09:40:00 PM

Title: Delivery Schedule
Post by: ekaneti on September 08, 2010, 09:40:00 PM
I ordered 50 plus C Series 100/300 aircraft. They are arriving about 1-2 per month tops. Does anyone think this is too slow. I know the delivery schedules were changed to make the game more realistic. But I have heard that American Airlines in real life is receiving 737-800s at the rate of one per week for 2010-2012. 1-2 per month make the game extremely slow to replace older aircraft.
Title: Re: Delivery Schedule
Post by: Curse on September 08, 2010, 09:49:47 PM
Yeah, it sucks hard, but sami will not change anything on this ...
Title: Re: Delivery Schedule
Post by: Bolier Dweller on September 08, 2010, 11:39:41 PM
Just a side note here, a 737 comes off the assembly line every 24 hours, there are 5 Assembly lines at the plant.
A 767,777,787, come off the line every other day at top production speed. I would say the delivery speed on here needs to change.
I was at the Evertt plant in Washington state the week before last.